What operations should be done after the assembly line equipment is put into operation

Before the operation of the full-automatic assembly line equipment, it is necessary to confirm first that the assembly line equipment, personnel and transported goods are in safe and sound conditions. Also, check whether all moving parts are normal and free of foreign matters, check whether all electrical circuits are normal, and put the assembly line equipment into operation when it is normal. The difference between the supply voltage and the additional voltage of the equipment shall not exceed ± 5%. What should be done when the equipment is put into operation in the full-automatic assembly line?

The general operation of the automatic assembly line equipment assembly line is as follows:

  1. Turn on the main power switch to check whether the equipment power is normally supplied and whether the power indicator is on. Proceed to the next step after it is normal. Close the power switch of each circuit to check whether it is normal.
  2. Under normal conditions, the equipment does not act, the operation indicator of the assembly line equipment is not on, the power indicator of the frequency converter and other equipment is on, and the display panel of the frequency converter is normal.
  3. During the operation of the assembly line equipment, it is necessary to strictly abide by the rules of the articles in the design of the transported articles and the design capacity of the assembly line equipment. It shall be noted that all kinds of personnel shall not touch the moving parts of the assembly line equipment, and non professional personnel shall not touch the electrical components and control buttons at will.

During the operation of the equipment in the full-automatic assembly line, the rear stage of the frequency converter cannot be disconnected. If the repair demand is determined, it is necessary to stop the frequency conversion operation, otherwise the frequency converter may be damaged. The operation of the automatic assembly line equipment is stopped. Press the stop button to cut off the main power supply after all the systems are stopped.

  1. Start the electrical equipment in sequence according to the process flow. After the last electrical equipment is started normally, the motor or other equipment has reached normal speed and normal condition, and then start the next electrical equipment.

To sum up, after the fully automatic assembly line equipment is put into operation, these operations can ensure the stable and normal operation of the whole production line.

Hongdali always open to our customers for their needs and concerns, so that we can better assist you for the conveyors systems and assembly lines.

Hongdali provide different kinds of conveyors, like roller conveyors, curve conveyors, belt conveyors, inclined conveyors… At the meantime, hongdali also provide assembly line for home appliance. We are looking agents allover the world to be our agent for wholesale conveyors, wholesale conveying system, wholesale working conveyors, wholesale belt conveyors systems,assembly lines agent, we supply conveyors and assembly lines accessories, like motors, aluminum frames, metal frame, running conveyor belt, speed controller, inverter, chains, sprockets, rollers, bearing… also we supply engineers technical supports, and provide the installation, maintain, training for you. Hongdali is always looking forward friends from all over the world to work with us.

Hongdali main products are assembly line, the automatic assembly line, the semi-automatic assembly line, roller conveyor type assembly line, belt conveyor type assembly line. Of course, Hongdali also provide different kinds of conveyor, green pvc belt conveyor, powered roller conveyor, non-power roller conveyor, gravity roller conveyor, steel wire mesh conveyor, Teflon conveyor with high temperature, food grade conveyor.

Hongdali have experienced engineer team and mechanical engineer team to support oversea projects. Our engineer team will help you to plan your factory based on your layout and guide you how to place the assembly line and conveyor. For installation, we will send engineer team to guide you how to install and train you how to use and maintain for the conveyor and assembly line. 


Post time: Sep-27-2022